Conceptual Framework for Developing Web-based Maintenance Systems for Government’s Simple-Buildings within the DKI Jakarta Provincial Government

Dyah Ayu Pangastuti, Yusuf Latief

Abstract


DKI Jakarta, as the capital of the Republic of Indonesia, has the highest population density in Indonesia, with a population of 16,334 people / km2. Therefore, community facilities and infrastructure within the DKI Jakarta Provincial Government play an important role so that community service can be carried out properly. As one of the main infrastructures, State Buildings must have building reliability as stated in the technical requirements stipulated in Presidential Regulation Number 73 of 2016. Building maintenance is an activity to maintain the building's reliability and infrastructure, and facilities so that the building always functions properly. Based on a survey conducted by the DKI Jakarta Provincial Office for The Creation of Works, Spatial Planning and Land Use in 2019, the number of building assets of Province DKI Jakarta are 9823 buildings. 60% of those buildings were classified as Simple-Building category. Due to the numerous building assets, maintenance activities need to be supported by an adequate maintenance system. This study aims to develop a building maintenance system based on web. The methodology used in this research are expert validation, interviews, field survey and literature studies. The results of the validation process will be developed into a simple-building’s web-based maintenance system framework.

Full Text:

PDF

References


Abdullah, S., Razak, A. A., Hanafi, M. H., & Salleh, M. N. (2011). Managing government property assets: The Main issues from the Malaysian perspective. Journal of Techno-Social, 3(1), 35–52.

Adam, F. (2017). Pengembangan pedoman pekerjaan preventive maintenance komponen bangunan mekanikal pada bangunan gedung pemerintah berbasis work breakdown structure untuk meningkatkan kinerja pemeliharaan dan perawatan (Unpublished Master Thesis). Universitas Indonesia.

Alshehri, A., Motawa, I., & Ogunlana, S. (2015). The common problems facing the building maintenance departments. International Journal of Innovation, Management and Technology, 6(3), 234–237. https://doi.org/10.7763/ijimt.2015.v6.608

Arisanti, K. (2020). Pengembangan sistem informasi untuk pekerjaan pemeliharaan dan perawatan komponen struktur bangunan hijau gedung pemerintahan dengan menggunakan building information modelling (BIM) (Unpublish Master Thesis). Universitas Indonesia.

Basri, E. I., Razak, I. H. A., Ab-Samat, H., & Kamaruddin, S. (2017). Preventive maintenance (PM) planning: A review. Journal of Quality in Maintenance Engineering, 23(2), 114–143. https://doi.org/10.1108/JQME-04-2016-0014

Djonli, Y. (2019). Pengembangan pedoman pekerjaan preventive maintenance komponen mekanikal pada bangunan gedung pemerintah berbasis work breakdown structure (WBS) untuk meningkatkan kinerja pemeliharaan dan perawatan. https://doi.org/10.1088/1751-8113/44/8/085201

Fathoni, R. (2019). Pengembangan pedoman pekerjaan preventive maintenance komponen lansekap dan tata grha pada bangunan pemerintah berbasis WBS untuk meningkatkan kinerja pemeliharaan dan perawatan (Unpublished Master Thesis). Universitas Indonesia.

Goodman, B. (2015). User interface framework. https://docs.oracle.com/cd/E12517_01/back_office/pdf/141/html/pos_impg2/uiframework.htm

Handayaniputri, A. (2020). Pengembangan e-maintenance pada pekerjaan pemeliharaan dan perawatan bangunan hijau gedung pemerintah berbasis Work Breakdown Structure (WBS) dengan menggunakan Building Information Modelling (BIM) untuk Meningkatkan kinerja pemeliharaan dan perawatan gedung (Unpublish Doctoral Dissertation). Universitas Indonesia.

Inayah, N. (2020). Structural Equation Model hubungan antara kebijakan, Work Breakdown Structure (WBS), pedoman, sistem informasi, dan Building Information Modeling (BIM) terhadap kinerja pemeliharaan pada bangunan gedung tinggi (Unpublished Master Thesis). Universitas Indonesia.

UU Republik Indonesia No. 28, Pub. L. No. 28, 21 Bangunan Gedung 147 (2002). https://doi.org/10.1007/978-1-4614-7990-1

Iskandar, E., Prayitno, E., Kurniawati, D., Sari, D. F., Amin, A., & Imron, A. (2018). Development of the nearest tourism determination application using Dijkstra algorithm. Proceedings of the 3rd International Conference of Project Management (ICPM) Bali 2019.

Ismail, Z. A. (2014). Improving maintenance management practices for building facility. Journal of Construction Engineering and Project Management, 4(3), 21–32. https://doi.org/10.6106/jcepm.2014.4.3.021

Naufal, M. (2020). Pengembangan pedoman pekerjaan preventive maintenance komponen struktur pada bangunan gedung pemerintah berbasis WBS untuk meningkatkan kinerja pemeliharaan dan perawatan (Unpublished Master Thesis). Universitas Indonesia.

Permen PUPR No. 24, Pedoman Pemeliharaan dan Perawatan Bangunan Gedung 16 (2008).

Putri, P. A. (2018). Improving business processes to develop standard operation procedures on government building maintenance work in Indonesia. MATEC Web of Conferences, 195. https://doi.org/10.1051/matecconf/201819506006

Rahmah, A. W. (2018). Development of execution guidelines for maintenance , reparation , and material specification determination of green building landscape component work in government building based on Work Breakdown Structure (WBS). Proceedings of the 1st International Conference of Project Management (ICPM) Malang 2018.

Samudra, R. (2019). Web based information system development of maintenance work to improve government building maintenance performance. IOP Conference Series: Earth and Environmental Science, 258(1). https://doi.org/10.1088/1755-1315/258/1/012034

Suryani, R., & Riantini, L. S. (2019). The development of green BIM based standard operating procedure on schematic design phase of building projects to improve duration performance from The perspective of architecture consultant. Journal of International Conference, 2(1), 1–10.

Suwandari, Y., & Sagita, L. (2019). Development of operational standards for risk-based cultural heritage office building maintenance procedures that the building safe and comfortable to use (Study Case Heritage Office Building PT . Asuransi Jiwasraya). Proceedings of the 3rd International Conference of Project Management (ICPM) Bali 2019).

Volk, R., Stengel, J., & Schultmann, F. (2014). Building Information Modeling (BIM) for existing buildings - Literature review and future needs. Automation in Construction, 38(March), 109–127. https://doi.org/10.1016/j.autcon.2013.10.023

Watchson, D. (2019). Pengembangan sistem informasi pemeliharaan dan perawatan bangunan gedung rusunawa berbasis Work Breakdown Structure (WBS) Dengan menggunakan Building Information Modeling (BIM) [Master Thesis, Universitas Indonesia].

Waziri, B. S., & Vanduhe, B. A. (2013). Evaluation of factors affecting residential building maintenance in Nigeria : Users’ perspective. Civil and Environmental Research, 3(8), 19–25.

Wijaya, L. (2020). Pengembangan pedoman pekerjaan preventive maintenance komponen arsitektur pada bangunan gedung pemerintah berbasis Work Breakdown Structure (WBS) untuk meningkatkan kinerja pemeliharaan dan perawatan (Unpublished Master Thesis). Universitas Indonesia.

Yudha, A. (2019). Pengembangan pedoman pekerjaan preventive maintenance komponen elektrikal pada bangunan gedung pemerintah berbasis WBS untuk meningkatkan kinerja pemeliharaan dan perawatan (Unpublished Master Thesis). Universitas Indonesia.




DOI: https://doi.org/10.32535/jicp.v4i1.1124

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 Dyah Ayu Pangastuti, Yusuf Latief

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

Flag Counter

Published by:

AIBPM Publisher

Editorial Office:

JL. Kahuripan No. 9 Hotel Sahid Montana, Malang, Indonesia
Phone:
+62 341 366222
Email: journal.jicp@gmail.com
Website:http://ejournal.aibpmjournals.com/index.php/JICP

Supported by: Association of International Business & Professional Management

If you are interested to get the journal subscription you can contact us at admin@aibpm.org.

ISSN 2622-0989 (Print)
ISSN 2621-993X (Online)

DOI:Prefix 10.32535 by CrossREF

Journal of International Conference Proceedings (JICP) INDEXED:

 

In Process


This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.