TIME ACCELERATION OF UNDERSTRUCTURE WORKS WITH FAST TRACK METHOD ZONING-BASED (CASE STUDY: TRANSIT ORIENTED DEVELOPMENT LIGHT RAIL TRANSIT JAKARTA PHASE I PROJECT)

Lusiana Indarwati, Yusuf Latief

Abstract


Light Rail Transit (LRT) Jakarta Phase I construction has a special purpose of launching Asian Games 18th on August 10th, 2018. In fact, this time cannot be achieved due to decision of design in Transit Oriented Development (TOD) building but it is a critical path of the overall schedule. Therefore, zoning is made with the fast track method. The purposes of this study are to develop dominant factors of making zoning, to develop fast track method with zoning-based and the proper form of zoning. The results are making zoning will be determined by manpower capacity and its risk and a grid-shape of zoning is a match in an acceleration of understructure work because the overall duration can reduce 41 days.

Full Text:

PDF


DOI: https://doi.org/10.32535/jicp.v2i1.455

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 Lusiana Indarwati, Yusuf Latief

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

Flag Counter

Published by:

AIBPM Publisher

Editorial Office:

JL. Kahuripan No. 9 Hotel Sahid Montana, Malang, Indonesia
Phone:
+62 341 366222
Email: journal.jicp@gmail.com
Website:http://ejournal.aibpmjournals.com/index.php/JICP

Supported by: Association of International Business & Professional Management

If you are interested to get the journal subscription you can contact us at admin@aibpm.org.

ISSN 2622-0989 (Print)
ISSN 2621-993X (Online)

DOI:Prefix 10.32535 by CrossREF

Journal of International Conference Proceedings (JICP) INDEXED:

 

In Process


This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.