Risk-Based Evaluation of Large-Span Roof Building Structure using Roll Forming Construction Method to Increase Project Performance

Batara Arifin Sirait, Yusuf Latief

Abstract


The large-span roof that is applied to many buildings nowadays are having some unique structural components, seen from its construction concept and design concept. Because of its uniqueness, several obstacles need to be considered. The application of roll forming machine in the making of the roof sheets can be used as a solution for several disputes that can happen while installing the large-span roof. The purpose of this research is to identify risk factors in large-span roof construction projects using the roll forming method. This research recruited 43 respondents in 24 different contractor companies. Based on the result of the questionnaire validation, this research analyzed 40 sub-variables need to be proceed into the qualitative risk analysis. Based on the outcome of the risk index assessment, there are 2 levels that need further scrutiny. It is the very high level of risk and the high level of risk. Regarding the risk level, some suggested strategy to improve the construction is to appoint an appropriate consultant, contractor, and construction management consultant, planning the detailed design and construction method, coordinate the roofing steel structure division, conduct some training for workers, and build a good collaboration between all stakeholders.

Keywords: Construction Method, Large-span Roof, Project Management, Roll Forming, Risk Management, Roof Structure


Full Text:

PDF

References


Agsarini, I., & Wiguna, I. A. (2015). Pengaruh Faktor Kondisi Proyek Terhadap Kinerja Proyek

Akmal I., (2009) Rangka atap baja ringan, Rumah Ide edisi 10/IV, Gramedia Jakarta, 2009

Alsamhan, A., Hartely, P., & Pillinger, I. (2003). The Computer Simulation of Cold-Roll-Forming using FE Methods and Applied Real Time Re-meshing Techniques. Journal of Materials Processing Technology.

Andi, Susandi, Wijaya. H. (2003). On Representing Factors Influencing Time Performance of Shop- House Contructions in Surabaya, Dimensi Teknik Sipil, Vol. 5 No. 2.. Retrieved May 29, 2015, from ced.petra.ac.id/ index.php/civ/article/download/15563/15555

Carpinteri, A., Bazzucchi, F., & Manuello, A. (2016). Nonlinear Instability Analysis of Long-span Roofing Structures: The Case Study of Porta Susa Railway Station

Desai, M. and Bhatt, R.(2013). Critical Causes of Delay in Residential Construction Projects: CaseStudy of Central Gujarat Region of India. International Journal of Engineering Trends andTechnology (IJETT),4(4),762-768. Retrieved from http://www.ijettjournal.org/ volume-4/issue-4/IJETT-V4I4P250.pdf

Dharma, A. A., Putera, I. G., & Parami, A. A. (2017). Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) pada Proyek Pembangunan Jambuluwuk Hotel & Resort Petitenget. Jurnal Spektran, 47-55.

Dumbrava, V. (2013), "Using probability – impact matrix in analysis and risk assessment projectsâ€, Journal of Knowledge Management, Economics and Information Technology, Vol. 42, pp. 76-96, available at: www.scientificpapers.org/wp-content/files/07_Dumbrava_Iacob-USING_PROBABILITY__IMPACT_MATRIX_IN__ANALYSIS_AND_RISK_ASSESSMENT_PROJECTS.pdf

Jooa, B. D., Leea, H. J., Kimb, D. K., & Moona, Y. H. (2011). A Study on Forming Characteristics of Roll Forming Process with High Strength Steel.

Groover, M. P. (2007). Fundamental of modern manufacturing. Pennsylvania: John Wiley & Sons.Inc

Milad R., Shanmuganathan G., Keerthan P., Hassan K. (2020) Shear design rules for roll-formed aluminum lipped channel beams. Structures 27 (2020) 1139–1164

Mistakidis, Euripidis & Thodorou, Aris & Yildirim, Mehmet. (2014). Construction Method Statement For The Steel Roof Of The Baku Olympic Stadium In Azerbaijan. 10.13140/2.1.2370.3363.

Persoona J, T. van Hooffa , B. Blockena,, J. Carmelietb,c, M.H. de Wita. (2008) On the impact of roof geometry on rain shelter in football stadia. Journal of Wind Engineering and Industrial Aerodynamics 96 (2008) 1274–1293

Rezakhani, P. (2012) “Classifying key risk factors in construction projects,†Bulletin of the Polytechnic Institute of Iasi— Construction & Architecture Section, vol. 62, no. 2, p. 27, 2012.

Shichao Ding, Paul A. Meehan, William J.T. Daniel. (2010) A novel sheet metal forming method—Millipede forming. Journal of Materials Processing Technology 211 (2011) 376–381

Sohrabinejad, A., & Rahimi, M. (2015). Risk Determination, Prioritization, and Classifying in Construction Project Case Study: Gharb Tehran Commercial-Administrative Complex. Journal of Construction Engineering.

Soeharto, I. 1995. Manajemen Proyek dari konseptual sampai operasional. Erlangga. Jakarta

Zhou, Meng & Fan, Jian-Sheng & Liu, Yu-Fei & Zhang, Jin-Xun & Duan, Xian-Jun & Lei, Su-Su. (2020). Non-uniform temperature field and effect on the construction of large-span steel structures. Automation in Construction. 119. 103339. 10.1016/j.autcon.2020.103339.

Yang, Q., Yu, S., Zhang, X., Wang, Z., Yan, J., & Chen, X. (2018). The Construction Technology of Roof Steel Structure in Yancheng Nanyang Airport. Advance in Civil Engineering, volume 2018, p.12




DOI: https://doi.org/10.32535/jicp.v5i1.1460

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Batara Arifin Sirait, Yusuf Latief

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

Flag Counter

Published by:

AIBPM Publisher

Editorial Office:

JL. Kahuripan No. 9 Hotel Sahid Montana, Malang, Indonesia
Phone:
+62 341 366222
Email: journal.jicp@gmail.com
Website:http://ejournal.aibpmjournals.com/index.php/JICP

Supported by: Association of International Business & Professional Management

If you are interested to get the journal subscription you can contact us at admin@aibpm.org.

ISSN 2622-0989 (Print)
ISSN 2621-993X (Online)

DOI:Prefix 10.32535 by CrossREF

Journal of International Conference Proceedings (JICP) INDEXED:

 

In Process


This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.